Tuesday 21 April 2015

So close yet so far, then it all comes together.

We are nearly there, any day now we should have hand over.

Carpets finished.


Hope it comes with a manual.
Vicky is home, SMEG 110cm Victoria in black.


Handover !



Never ending unpacking and moving, starting to come together.

Saturday 18 April 2015

Splash !

Lots of details finished this week, splash back installed, wardrobes fixed, paint touched up, gas finished. Should be less than a week to handover.



Colour is "Cosmic Aura"
Now its finally time for the 110cm cooker.
We had drawers added to both ends of the master robe.


lastly the double point for gas bottles.

Saturday 11 April 2015

Counting down to handover, timber floors are in.


Colour is Genesis Bamboo Sandy Beech.




Very happy to see such a nice job and after so much trouble seeing the recessed door tracks it was worth it, no step up at all !




Tuesday 7 April 2015

Wednesday 1 April 2015

All the nice bits !


En suite coming along, frameless shower and mirrors installed.


En suite details.





Robe in master (Double sided)


Kitchen down lights, possibly too many.


The LIN1 doors with clear finish.


Bathroom with frameless shower screen also.


The butlers pantry and sink, 2 pak shelf fronts and matching stone to kitchen.




Main sink set in the 40mm Essastone "Galileo"





Master bedroom pendants, not 100% sure on the finish.