Baby its cold outside !

Well it will be soon, so the insulation has gone in before the plaster board next week.



"Great room"

Master bathroom

Surprised to see the entire house swept by the SS this week.

Down pipes, not much more to go outside.

Sunday 25 January 2015

Evie part 1, 2 and 3

So the Eaves are finished !


and the poles have started !



Verandah.




and

Sunset over the house, thats the evening view from the alfresco !



From the lower side looking back to the house.


Tuesday 20 January 2015

Electrical rough in and more.




Four power circuits and four light circuits !


One of three TV points.


We optioned power points and a light in the roof space to make the space more usable.


Eaves coming along nicely.


The ducted vacuum being installed.




Finally, if you have been watching closely you will notice a change to the window sills.


Tuesday 13 January 2015

Bricks continued.

After the Christmas break they got straight back into finishing the brick work.







Data (Cat 6) cable has been run through the house.