Outside painting done !
Mcdonald Jones Bronte Lodge
Sunday, 29 March 2015
Friday, 27 March 2015
Stone and garage doors.
Garage doors in Surfmist.
Ensuite bench and basins are done.
Kitchen including the sink ! Black to match the 110cm Smeg cooker.
Second bathroom
Laundry also in stone
You can never have too much garage space.
Saturday, 21 March 2015
Painting continues, the end is close !
Brickwork is primed for bagging (Tombstone NH71). Gable ends are surfmist with ironstone roof colour detail.
Fish tank opening in great room. Wall colour is Almond ice NH31, ceiling is illusive white NH29.
The Lin1 doors with clear coat applied.
Master ensuite, paint and grout finished.
Front door to match roof (Ironstone), columns and eaves are surfmist.
Fish tank opening in great room. Wall colour is Almond ice NH31, ceiling is illusive white NH29.
The Lin1 doors with clear coat applied.
Master ensuite, paint and grout finished.
Front door to match roof (Ironstone), columns and eaves are surfmist.
Sunday, 15 March 2015
Fence is gone and painting has started.
So pleased to see the "security" fence removed.
First coat of paint on most walls and ceilings, I think i love the colours !
First coat of paint on most walls and ceilings, I think i love the colours !
Sunday, 8 March 2015