Mcdonald Jones Bronte Lodge

Mcdonald Jones Bronte Lodge

Wednesday, 11 February 2015

Cornice, wet area seal and doors


21 doors, 20 of them extra tall to fit the extra height ceilings.






Pacific upgraded cornice





Friday, 6 February 2015

Plasterboard continued.

In just two days all the plasterboard has been hung and it is well on the way to completed, great job.



Fish tank opening.




Monday, 2 February 2015

Facade finishing touches and plasterboard begins.

The columns, moldings and detail on roof complete the facade, just needs the bagging/paint.







8.3 Tonnes of plaster board sheet carried by hand into the house and garage, it took them 6 hours !




Thursday, 29 January 2015

Baby its cold outside !

Well it will be soon, so the insulation has gone in before the plaster board next week.



"Great room"

Master bathroom

Surprised to see the entire house swept by the SS this week.

Down pipes, not much more to go outside.

Sunday, 25 January 2015

Evie part 1, 2 and 3

So the Eaves are finished !


and the poles have started !



Verandah.




and

Sunset over the house, thats the evening view from the alfresco !



From the lower side looking back to the house.


Tuesday, 20 January 2015

Electrical rough in and more.




Four power circuits and four light circuits !


One of three TV points.


We optioned power points and a light in the roof space to make the space more usable.


Eaves coming along nicely.


The ducted vacuum being installed.




Finally, if you have been watching closely you will notice a change to the window sills.


Tuesday, 13 January 2015

Bricks continued.

After the Christmas break they got straight back into finishing the brick work.







Data (Cat 6) cable has been run through the house.

Finally some of the details like the columns and the window sills.