Mcdonald Jones Bronte Lodge

Mcdonald Jones Bronte Lodge

Sunday, 14 June 2015

Outside is progressing slowly.


Septic system hidden from view.
Tank and shed.

Cut for retaining wall, its deeper now. Drainage installed across front of house


Driveway one day !

Its been a while but we are in and have started to furnish and landscape.

Very happy with the house, busy updating furniture and appliances.

Went for king sized in the main, the room is very large so it works well. Privacy screen as we haven't picked blinds yet.

Entrance, still to find some art for the recess.

Great room lounges

Kitchen, easy to clean. We don't love the dishwasher but it does the job.
Settled on the Samsung showcase door fridge, still need to recess the power point to improve appearance.

Children activity, we have bean bags for lounging around.
Four stools fit comfortably across breakfast bar.

We opted for a square dining (two rectangles) for flexibility. 8 seats normally.

Study desperately needs some bookcases.

Tuesday, 21 April 2015

So close yet so far, then it all comes together.

We are nearly there, any day now we should have hand over.

Carpets finished.


Hope it comes with a manual.
Vicky is home, SMEG 110cm Victoria in black.


Handover !



Never ending unpacking and moving, starting to come together.

Saturday, 18 April 2015

Splash !

Lots of details finished this week, splash back installed, wardrobes fixed, paint touched up, gas finished. Should be less than a week to handover.



Colour is "Cosmic Aura"
Now its finally time for the 110cm cooker.
We had drawers added to both ends of the master robe.


lastly the double point for gas bottles.

Saturday, 11 April 2015

Counting down to handover, timber floors are in.


Colour is Genesis Bamboo Sandy Beech.




Very happy to see such a nice job and after so much trouble seeing the recessed door tracks it was worth it, no step up at all !




Tuesday, 7 April 2015

Details continue.

Lighting is finished, Aircon is in, ducted vacuum is done.










Wednesday, 1 April 2015

All the nice bits !


En suite coming along, frameless shower and mirrors installed.


En suite details.





Robe in master (Double sided)


Kitchen down lights, possibly too many.


The LIN1 doors with clear finish.


Bathroom with frameless shower screen also.


The butlers pantry and sink, 2 pak shelf fronts and matching stone to kitchen.




Main sink set in the 40mm Essastone "Galileo"





Master bedroom pendants, not 100% sure on the finish.